[1] |
Houbolt,J.C.,A Recurrence Matrix Solution for the Dynamic Response of Elastic Aircraft,J.Aeronaut.Sic.,17,(1950),540-550.
|
[2] |
Newmark,N.M.,A Method of Computation for Structural Dynamics,Proc.Am.Soc.Civ.Eng.,85,EM3(1959),67-94.
|
[3] |
Chan,S.P.and H.L.Cox,Transient Analysis of Forced Vibrations of Complete Structural-Mechanical Systems,JLR.Aeronaut.Soc.66,(1962),457-460.
|
[4] |
Gurtin,M.E.,Variational Principles for Linear Elasto-Dynamics,Archs.Ration.Mech.Analysis,16,(1964),34-50.
|
[5] |
Wilson,E.L.,A Computer Program for the Dynamic Stress Analysis of Underground Structures,Report No.68-1,Univ.of Calif.,Berkeley,(1968).
|
[6] |
Zienkiewicz,O.C.,A New Look at the Newmark,Houlbot and Other Time Stepping Formulas:A Weighted Residual Approach,Earth.Eng.Stru.Dyna.,5,(1977),413-418.
|
[7] |
Hilber,H.M.,Collocation Dissipation and‘Overshoot' for Time Integration Shemes in Structural Dynamics,EARTH,ENG,and STRU.DYNA.,6,(1978),99-117.
|
[8] |
Richmyer,Robert D.,Difference Methods for Initial-Value Problems,Inter-science Publishers,New York(1967).
|
[9] |
钱伟长,《变分法及有限元》(1978).
|
[10] |
Connor,J.J.,《流体流动的有限元技术》(1976).
|
[11] |
杨真荣、徐萃薇、王大钧、周本华、魏泽光,有限元法动力分析,全国计算技术会议文选(1973),748.
|
[12] |
沈崇刚、陈厚群、杨真荣等,新丰江水库地震及其对大坝的影响,国际大坝会议11届会议论文,中国科学,17,2(1974).
|
[13] |
徐宗和、罗学海、杨真荣等,新丰江水库诱发地震的强震观测,国际诱震第一届学术讨论会报告(1975),
|
[14] |
杨真荣,动力问题的有限单元法,科学院计算所(1975).
|
[15] |
科学院计算所,建研院等,平面框架非线性地震反应分析初探(1978).
|
[16] |
杨真荣,动态问题速度有限元法,应用数学和力学,1,1(1980).
|
[17] |
Whiteman,J.R.,The Mathematics of Finite Elements and Applications,United States Edition,published by Academic Press,Inc.,New York.
|