| Citation: | ZHANG Jian, YE Jian-shu, ZHAO Xin-ming. Dynamic Bayesian Estimation of Displacement Parameters of Continuous Curve Box Based on Novozhilov Theory[J]. Applied Mathematics and Mechanics, 2007, 28(1): 77-84. | 
	                | [1] | 
					 项海帆.高等桥梁结构理论[M].北京:人民交通出版社, 2001. 
					
					 | 
			
| [2] | 
					 肖汝诚. 桥梁结构分析及程序系统[M].北京:人民交通出版社, 2002. 
					
					 | 
			
| [3] | 
					 Ghani R A, Hangang U.Thin-walled multicell box-girder finite element[J].Structure Engineering, ASCE,1991,117(10):2953-2971. doi:  10.1061/(ASCE)0733-9445(1991)117:10(2953) 
					
					 | 
			
| [4] | 
					 Luo Q Z,Li Q S,Tang J.Shear lag in box girder bridges[J].Journal of Bridge Engineering,2002,7(5):308-313. doi:  10.1061/(ASCE)1084-0702(2002)7:5(308) 
					
					 | 
			
| [5] | 
					 赵振铭, 陈宝春. 杆系与箱型梁桥结构分析及程序设计[M].广州: 华南理工大学出版社, 1997. 
					
					 | 
			
| [6] | 
					 张佑启.箱形梁桥的有限条分析[M].北京:人民交通出版社, 1978. 
					
					 | 
			
| [7] | 
					 Lee S H,Kim S I,Lee J H,et al.Two-parameter beam-column model and back analysis for flexible earth retaining walls[J].Couputers and Geotechnics,2004,31(6):457-472. doi:  10.1016/j.compgeo.2004.06.002 
					
					 | 
			
| [8] | 
					 Chi S Y,Chern J C,Lin C C.Optimized back-analysis for tunneling-induced ground movement using equivalent ground loss mode[J].Tunnelling and Underground Space Technology,2001,16(3):159-165. doi:  10.1016/S0886-7798(01)00048-7 
					
					 | 
			
| [9] | 
					 束善杭. 参数的随机反演方法及其面向对象的程序设计[D].硕士学位论文.南京: 河海大学, 2000. 
					
					 | 
			
| [10] | 
					 范鸣玉, 张莹.最优化技术基础[M].北京: 清华大学出版社, 1982. 
					
					 |